Turning his attention back to the obstacle, Mike scanned the surface and found a number of foot and handholds where railings and other pieces of infrastructure had been ripped off this particular bulkhead or whatever purpose it had served in its original location.
He climbed until his head poked up into the darkness.
Muscles screaming, he reached a hand into the darkness in order to find something to pull himself up with but found nothing and began to slip. “Shit, shit…”
The two engineers peered above again, each one grabbing his hand.
Despite being tiny, they had enough strength to stop him from falling and helped to drag him up.
They managed to crouch in the narrow gap, but Mike had to stay on his arms and knees and shuffle through the darkness as they led, their screens bathing the tight passage with blue light.
Another twenty or so meters later and Mike found himself dropping out of the passage into the center of the maintenance room.
Clean, off-white, smooth surfaces surrounded the three-meter-square room. The walls must have been strengthened, as the ceiling, just a few centimeters above Mike’s head, hadn’t collapsed.
Blinky showed Mike the screen.
A diagram showed that the part they needed was behind one of the wall panels. Mike located it and reached forward with his arm to open the panel, but quickly pulled it back as something touched his skin and sizzled with a burn.
“Jesus, what the…”
A sizzling noise came from all around him. He looked up.
Through holes in the ceiling, a clear, acidic liquid dripped into pools on the floor. The two aliens backed off. “Oh, this is just great.”
The liquid, fuel or some kind of coolant, Mike guessed, was burning through the metal. The spot on his skin continued to burn.
Just great. If it wasn’t hard enough to get here, he now had to extricate a delicate part while avoiding multiple streams of acid.
“Well, best I get on with it, then, eh? Don’t look like you two care to help out much…” He shook his head and pulled the sling around his chest. He fished out a flat-tipped screwdriver and leaned carefully forward to the panel.
A stray drip bounced off the edge of his shoe, instantly melting through the leather and making him wince.
“Goddammit.”
Making himself as small as possible, he pried the panel open.
“Is this it?” Mike called out, pointing to a glowing green cylinder the size of a soda can. Wires and tubes connected to a lid on its top.
Blinky clicked his affirmation.
There didn’t appear to be any obvious way of removing it without damaging the metal cap that took the wires and tubes.
Taking a small multimeter, Mike checked it. The voltage and current were off the scale. Have to be careful with this baby, he thought.
As Mike thought how best to remove the device without breaking it, a terrible crack boomed from above him. He managed to duck out of the way as a crossbeam gave way and fell down. It struck Grumpy on the head, knocking him to the ground.
Mike couldn’t move away in time, frightened of stepping into the acid stream. The beam fell onto his ankle, trapping him in place.
The new hole above, with metal sheeting pointing down, funneled more acid into the tight room.
Mike looked away as a pool of it splashed onto the unmoving form of Grumpy.
He hated that he felt something for the poor bastard, but…
“Hey, where are you going?” Blinky had climbed the beam and disappeared back out of the passage into the gloom. “Come back here, you little…”
Damn this bullshit!
Mike tried his leg, but the beam was too heavy across his foot and ankle. It had probably broken it, if the pain was anything to go by.
With the acid filling the room with bitter, sharp fumes, Mike had no other option but to get to work. If he couldn’t get out of here and someone came for him after he had died, at least he’d get the part out of the system for them.
Fishing through his sling of tools, Mike took a shallow breath and set to work, all the while the sizzling of the dead croatoan’s body reminded him what awaited him if he didn’t get free.
Mike yelled with triumph; the part came free and he hadn’t shocked himself with the full power of a piece of alien tech. Score one for Mike, but the sizzling of the acid had grown in volume.
The stench of hot metal and liquidized alien corpse made him want to retch.
Keeping his cool, Mike placed the part safely into a fabric wrap in the sling around his chest. Job one done; now how the hell to get out? He tried his ankle, but any movement sent a piercing stab of pain up his leg, and it remained well and truly stuck beneath the metal beam.
Looking over his shoulder, Mike saw that the acid had pooled in the far corner. He doubted it’d be long before whatever it was had filled to such an extent that it’d cover the entire floor and burn through his leg.
Might be one way out, he thought grimly.
He bent down carefully and tried to heave the beam up, gripping it by the edges, but it was too heavy for him to move. Then it occurred to him… of course, the radio! He pulled it free of the belt pouch and pressed the transmitter button, bringing the receiver to his lips… nothing. No squelch, no sound, not even static. He shook it and heard parts rattle inside. The case had cracked when he got trapped earlier.
“Seriously? Can I catch at least one damned break today?”
The mother ship rattled as something struck the hull, sending a loud booming noise throughout. It came again, this time making him reach out to grab the panel in order to keep his balance.
Two more booms and the shaking of the hull and he realized what it was: gunfire. There must have been reinforcements turn up.
Debris and fragments of metal sheeting fell through the hole above as the onslaught continued. Mike gritted his teeth and heaved again, trying to free his left leg. The pain gripped his throat. His body tried to shut down in order to deal with the agony. But still the beam wouldn’t budge.
“Help!” Mike yelled at the top of his voice, hoping someone would hear, but with the sound of another battle going on outside, he doubted it, and if that damned alien hadn’t betrayed him and ran off, he might be able to help.
Seeing his friend crushed with the beam was probably the last straw.
This was why no one should trust the aliens—even the ones that appeared friendly. Integrated into Unity or not, this proved they cared not one bit about humanity.
Slumping against the wall, he resigned himself once again that this was perhaps his last action.
But like last time, the shadows from the access point shifted, and there was Blinky, crawling out of the narrow space and carrying… what was that? A pole.
“Hey,” Mike said, pointing to his leg. “Help me? I have the part. We need to go before the ceiling caves in.”
Blinky blinked, taking in the scene. A sad expression came over his face when he looked upon his fallen friend. But as quickly as the look came, it faded away, replaced by one that Mike thought was determination.
The little alien scrambled off the ledge, being careful not to stand in a pool of acid or walk into one of the falling streams. He dragged a piece of debris, a meter cubed or so, and used it as a pivot for the two-meter-long pole. Jamming it into a space beneath the beam, the alien heaved.
At first it didn’t budge.
Mike secured the part, bent down, and helped to lift the beam as Blinky pushed down on the lever. The beam shifted. A rush of hope and relief flooded Mike as he pulled his leg out. He shouted with triumph, but it was clear the ankle was badly sprained, if not broken. He could barely put his weight on it.
Читать дальше